+86-138-6184-3442​​​​​​​
地球 copy Created with Sketch.
搜索小 copy Created with Sketch.
地球 copy Created with Sketch.
You are here: Home » Products » Tube and coupler » Tube and coupler

loading

Share to:
facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
kakao sharing button
snapchat sharing button
sharethis sharing button

Tube and coupler

A tube and coupler scaffold has a platform(s) supported by tubing, and is erected with coupling devices connecting uprights, braces, bearers, and runners. Due to their strength, these scaffolds are frequently used where heavy loads need to be carried, or where multiple platforms must reach several stories high. These scaffolds can be assembled in multiple directions, making them the preferred option for work surfaces with irregular dimensions and/or contours.
Availability:
Quantity:

A tube and coupler scaffold has a platform(s) supported by tubing, and is erected with coupling devices connecting uprights, braces, bearers, and runners. Due to their strength, these scaffolds are frequently used where heavy loads need to be carried, or where multiple platforms must reach several stories high. These scaffolds can be assembled in multiple directions, making them the preferred option for work surfaces with irregular dimensions and/or contours.


When Erecting a Scaffold

• Use footings that are level, sound, rigid and capable of supporting the load without settlement or displacement.

• Plumb and brace poles, legs, posts, frames, and uprights to prevent swaying and displacement.

• Position the first level of bracing as close to the base as possible.

• Plumb and level the scaffold as it is being erected.

• Fasten all couplers and/or connections securely before assembling the next level.

• Install guys, ties, and braces according to the manufacturer’s recommendations.

• Do not intermix scaffold components from different manufacturers, unless you can do so while maintaining the scaffold’s structural integrity.

• When platform units are abutted together to create a long platform, each abutted end must rest on a separate support surface.

• Once erected, provide toeboards on all railed sides to prevent falling object hazards.

Previous: 
Next: 
Wuxi Reliable is a scaffolding and formwork manufacturer and exporter in china, located in wuxi, china.
CONTACT US
We have an excellent technical team
Form Name

帮助

Follow Us
Copyright © 2024 Wuxi Reliable Scaffolding& Formwork Co., Ltd. All Rights Reserved.  |  Sitemap   |  Privacy Policy  |  Technology by leadong.com